As the Belk store at Friendly Center grew beyond its available square footage, the company looked...
View Project
The Town Operations Center project is a multi-building campus to accommodate the Public Works...
1,200-cell expansion detention center
Steven Tanger Center for the Performing Arts is a public-private partnership developing a...
Exterior façades were renovated and updated to give the shopping center an upscale new look.
Sitework, ground improvement by way of 300 Rigid Inclusions (RI) plus pad prep and pavement for...
DHGC worked very closely with the customers on this project to make their dreams become a...
A challenging facade alteration on eight retail buildings of the entire Tanger Center in Mebane. ...
we constructed an approximately 40,000 sf pre-engineered metal building, which houses their...
Burke Industrial brought us in because Pilgrim's Pride needed a new 12,000 SF ground-up office...
D.H. Griffin Construction Co. built out a 20,000 SF big box to create a top-of-the-line...
This design/build project saw the entire reconfiguration and interior construction of a...
This BB&T project saw the construction of a new branch bank location totaling 3,200-sq.-ft. over...
This project was a tenant upfit totaling 4,000-sq.-ft. of office space located in a high end...
15,000 SF of existing, vacant warehouse space received a 2,500 SF office renovation that included...
This project required the reconfiguration and combining of three existing retail suites into one...
D.H. Griffin Construction worked directly with The Fresh Market to build out their corporate...
This Shops at Friendly is a 300,000-sq.-ft. mixed-use upscale lifestyle center constructed in the...
DHGC worked directly for Gander Mountain to renovate an existing store with new interior finish...
A 196,600-sq.-ft., structural steel-framed building of a prototype design, one of three...
Upfits that converted warehouse space into operational raised-floor data centers to expand our...
General contracting services to High Point University to transform a former Circuit City retail...
Roofing modifications applied to Wrenn and McEwen Halls at High Point University, including the...
Johnston Medical Center’s new imaging suite provides the hospital with an outpatient setting for...
A superb example of adaptive reuse, and green technology in primary education.
Worked with Zimmer Development to modify an existing former Books-A-Million location with an...
The 88,674-sq.-ft. new construction building at NC A&T State University provides the university...
Completely reconfigure 50,000 SF of unfinished shell space to accommodate the interior...
This project renovated 56,000-sf of aging office into Class B+ office space to provide a new home...
OmniSource is a metal recycler with facilities in eight states that provides B2B and consumer...
Modify existing retail spaces with all-new facades, MEP and fire protection services, a complete...
The Proehlific Park Mezzanine Upfit project saw the insertion of a 12,000-sq.-ft., two-story...
This project saw the upfit construction of a 8,200-sq.-ft. real estate office in only seven...
The project was a 44,000-square-foot building on an (8) acre site.
A total retrofit of an existing 13,000 SF building, including installing high-efficiency...
During the 6-week phased project, we performed upgrades to the bar area, added outside seating,...
The Toys & Co. project combined multiple small shops to form one 7,000-sq.-ft. space on a...
The ULTA project was an 11,000-sq.-ft. tenant space reconfiguration and renovation project...
The Benson Food Court project at Wake Forest University was a multi-phased interior renovation...
Retrofit the entire first floor office space inside an existing three story office building while...
D.H. Griffin has provided renovation construction services for two locations of Advanced Home...
Anthropologie is a high-end retailer located in one of Greensboro’s major upscale lifestyle...
Charming Charlie is a ladies accessory boutique. Our team performed a complete demolition and...
The brand new Clinton High School, built adjacent to the existing Clinton High, provides the...
The Ragsdale High School addition and renovation project provided much needed repairs and...
This was a five-week, fast-track project where D.H. Griffin Construction built a 2,500-sq.-ft....
This was a multi-faceted project with the ultimate goal of accommodating a CommunityOne Bank...
Since 2012, D.H. Griffin Construction has been involved in numerous design-build projects for...
The East Wake High School project was a two-phased renovation and addition project. Between the...
In mid April 2011, a tornado ravaged Greene County Middle School, the only middle school in the...
Greensboro Pathology / Aurora Diagnostics is a medical laboratory that provides rapid off-site...
Expand by upfitting a new 3,200 SF orthodontics office.
Heritage High School is the second of two 272,000-sq.-ft. new-construction high schools built by...
Demolition, reconfiguration and renovation of numerous small shops into one 2-story H&M...
This 11,200 SF renovation of former retail space provides the home of the brand new Physician’s...
The Addition provided a much-needed expansion for Raleigh’s historic Millbrook High School.
Mills Park Middle School is a three story structural steel framed building including all...
The Legislative Office Building Reno project consisted of approximately 180,000 square feet of...
The Headquarters and Education Center is a LEED Gold building built for the N.C. Wildlife...
Panther Creek High School is 276,000 square foot new construction on a 53 acre site mainly...
This 365,000-sq.-ft. structure is built with pre-cast concrete and offers 1,050 parking spaces.
Our work for Raleigh Neurology included two medical office projects totaling 110,000 SF for one...
This new-construction, 15,000-sq.-ft. central plant includes three water-cooled chillers, three...
Rolesville Middle School is a 196,600-sq.-ft., structural steel-framed building of a prototype...
Transformed a vacant retail space into a 35,000-sq.-ft. operations/call center for Sears.
This project created three retail parcels in one vacant section.
The UNC steam tunnel replacement project involved constructing over 2,000 linear feet of new...
This new-construction medical office building provides 30,000-sq.-ft. of space for physicians and...